Concrete Mix Calculator
Concrete
Volume =
Shrinkage = 52
Mix Ratio
Sand = 1
Cement = 2
Aggregate = 4
Sand =
Cement =
Aggregate =
Water =
total =
added =
Help
Estimate cement, sand, gravel and water for the concrete mix based on the selected ratio of each. The shrinkage factor, standard of 52%, accounts for the compaction of the parts when mixed together with water.
Rows
Concrete
-Volume: Total volume of concrete to be mixed.
-Shrinkage: Shrinkage factor, as a percentage, accounts for the loose parts compacted to yield the total volume needed. Default is set to a standard of 52%.
Mix Ratio
-Sand: Ratio of sand, in parts, to the total mix.
-Cement: Ratio of cement, in parts, to the total mix.
-Aggregate: Ratio of aggregate, in parts, to the total mix.
-Sand: Volume of sand for this mix.
-Cement: Volume of cement for this mix.
-Aggregate: Volume of aggregate for this mix.
-Water: Total gallons or Liters of water for this mix.
Examples
Estimate cement, sand, gravel and water for a concrete mix based on a standard ratio of 1 part sand, 2 parts cement, and 4 parts of aggregate to yield a total of 12 cubic yards of concrete.
Concrete
-Volume: 12yd³
-Shrinkage: 52%
Mix Ratio
-Sand: 1
-Cement: 2
-Aggregate: 4
The following mix is required:
-Sand: 2.61yd³
-Cement: 5.21yd³
-Aggregate: 10.42yd³
-Water: 260.57 gal
Keywords
Volume
Shrinkage
Sand
Cement
Aggregate
Sand
Cement
Aggregate
Water
-------------