Mold Capacity Calculator
Efficiency = 85
Cycle Time =
Cavities =
Capacity
Capacity per Hour =
Capacity per Day =
Capacity per Week =
Capacity per Month =
Capacity per Year =
Help
Calculates the production molding capacity based on an specific efficiency, cavitation and cycle time.
Contributed by Jorge Sandoval.
Examples
1 injection mold with 8 cavities running at 20 seconds cycle time with 85% efficiency, the production capacity is as follows:
Efficiency%: 85.00
Cycle Time: 20.0
Cavities: 8
Capacity per hour: 1,224
Capacity per day: 29,376
Capacity per Week: 205,632
Capacity per Month: 881,280
Capacity per Year: 10,281,600